New-build snagging checklist
How to use this checklist
Walk the house in daylight with the latest drawings. Note the room, a short description, and a photo for every item. Do not rely on memory on the drive home.
This list is for buyers preparing for a snagging inspection and for inspectors who want a consistent pass. It is not a structural survey.
Every room
Check these on each visit before you leave the space.
- Walls, ceilings, and paint: scuffs, roller marks, incomplete cuts, hairline cracks at joints.
- Floors: hollow tiles, lippage, scratched timber, incomplete beading.
- Doors: bind, latch, paint on hardware, missing buffers, uneven gaps.
- Skirting, architrave, and window boards: gaps, nails showing, unfilled mitres.
- Sockets, switches, and faceplates: level, painted-in, working, labelled where needed.
- Radiators or underfloor zones: secure, bleeding, thermostat present.
Kitchen and utility
Kitchens generate a long snag list on Irish new-builds.
- Worktop joints, upstands, and sealant at the sink and hob.
- Cabinet doors and drawers aligned; soft-close working.
- Appliances level, plinths fitted, extraction ducted correctly.
- Taps: drips, spray pattern, isolators accessible.
- Tiling splashback: grout, cuts, and silicon at junctions.
Bathrooms and ensuite
Water and tile work show up quickly if rushed.
- Sanitaryware level, cistern quiet, no marks on enamel or acrylic.
- Shower door or screen: seals, leaks on a short run of water, tray falls.
- Silicone at bath, tray, and basin - missing, split, or mould-stained from a damp house.
- Floor and wall tile cracks, especially at door thresholds.
- Extractor fan: runs, vents outside, not into the attic.
Windows, external doors, and attic
Stand outside as well as in. Condensation between panes and missing trickle vents are common.
- Opening sashes and locks; keys labelled.
- Mastic to frames inside and out.
- Glass: scratches, trapped debris, failed seals.
- Attic hatch, insulation coverage, and any tank or flue that should be accessible.
Outside, garden, and services
A snagging visit should include the elevation, not only the rooms.
- Render, brickwork, and pointing; missing ridge or verge tiles.
- Gutters, downpipes, and gullies clear and falling the right way.
- Paths, steps, and patio falls away from the house.
- Fencing, gates, turf, and boundary as per the contract.
- Meter box, EV duct, outside tap, and consumer unit labelling.
Inspectors: pin this list on the plan
Snaglad keeps each defect on the floor plan with photos and a PDF the builder can work from.